如何使用 SQL 在 SQL Server Agent 中获取上次运行的作业详细信息,包括仅针对上次运行的作业(而不是作业结果)的步骤详细信息,因为我想在应用程序中显示它
请帮忙解决这个问题好久了
这是我一直在下面使用的代码,它会返回作业历史记录中所有作业的所有步骤,
但是,我只想查看上次运行作业的步骤
谢谢
USE msdb
Go
SELECT j.name JobName,h.step_name StepName,
CONVERT(CHAR(10), CAST(STR(h.run_date,8, 0) AS dateTIME), 111) RunDate,
STUFF(STUFF(RIGHT('000000' + CAST ( h.run_time AS VARCHAR(6 ) ) ,6),5,0,':'),3,0,':') RunTime,
h.run_duration StepDuration,
case h.run_status when 0 then 'Failed'
when 1 then 'Succeeded'
when 2 then 'Retry'
when 3 then 'Cancelled'
when 4 then 'In Progress'
end as ExecutionStatus,
h.message MessageGenerated
FROM sysjobhistory h
inner join sysjobs j
ON j.job_id = h.job_id
LEFT JOIN (
SELECT
[job_id]
, [run_date]
, [run_time]
, [run_status]
, [run_duration]
, [message]
, ROW_NUMBER() OVER (
PARTITION BY [job_id]
ORDER BY [run_date] DESC, [run_time] DESC
) AS RowNumber
FROM [msdb].[dbo].[sysjobhistory]
WHERE [step_id] = 0
) AS [sJOBH]
ON j.[job_id] = [sJOBH].[job_id]
AND [sJOBH].[RowNumber] = 1
where j.job_id = 'F04E5D3B-C873-448A-805C-C6309A92DAEC'
ORDER BY j.name, h.run_date, h.run_time desc
GO
最佳答案
希望对你有帮助,
对 msdb.dbo.sysjobactivity 的附加连接显示作业级别的开始/结束时间。使用此范围,您可以指定仅显示最近运行的作业步骤。
DECLARE @job_id UNIQUEIDENTIFIER
,@job_name VARCHAR(256)
SET @job_id = 'DF4C9555-5B24-4649-97CE-5708C53F762C'
SET @job_name = 'syspolicy_purge_history'
--search for job_id if none was provided
SELECT @job_id = COALESCE(@job_id,job_id)
FROM msdb.dbo.sysjobs
WHERE name = @job_name
SELECT t2.instance_id
,t1.name as JobName
,t2.step_id as StepID
,t2.step_name as StepName
,CONVERT(CHAR(10), CAST(STR(t2.run_date,8, 0) AS DATETIME), 111) as RunDate
,STUFF(STUFF(RIGHT('000000' + CAST ( t2.run_time AS VARCHAR(6 ) ) ,6),5,0,':'),3,0,':') as RunTime
,t2.run_duration
,CASE t2.run_status WHEN 0 THEN 'Failed'
WHEN 1 THEN 'Succeeded'
WHEN 2 THEN 'Retry'
WHEN 3 THEN 'Cancelled'
WHEN 4 THEN 'In Progress'
END as ExecutionStatus
,t2.message as MessageGenerated
FROM msdb.dbo.sysjobs t1
JOIN msdb.dbo.sysjobhistory t2
ON t1.job_id = t2.job_id
--Join to pull most recent job activity per job, not job step
JOIN (
SELECT TOP 1
t1.job_id
,t1.start_execution_date
,t1.stop_execution_date
FROM msdb.dbo.sysjobactivity t1
--If no job_id detected, return last run job
WHERE t1.job_id = COALESCE(@job_id,t1.job_id)
ORDER
BY last_executed_step_date DESC
) t3
--Filter on the most recent job_id
ON t1.job_id = t3.job_Id
--Filter out job steps that do not fall between start_execution_date and stop_execution_date
AND CONVERT(DATETIME, CONVERT(CHAR(8), t2.run_date, 112) + ' '
+ STUFF(STUFF(RIGHT('000000' + CONVERT(VARCHAR(8), t2.run_time), 6), 5, 0, ':'), 3, 0, ':'), 121)
BETWEEN t3.start_execution_date AND t3.stop_execution_date
编辑:在顶部添加了两个参数,@job_id 和@job_name。如果未提供@job_id,首先它将尝试确定提供的@job_name 的job_id,并在未提供任何值时返回上次运行的作业。
关于sql - 如何在 SQL 中获取上次运行的作业详细信息,我们在Stack Overflow上找到一个类似的问题: https://stackoverflow.com/questions/21310616/